SAP Cost Center Accounting

Table of Contents

SAP Cost Center Tutorial

  • SAP Cost centers are responsibility areas for costs within organization and used to capture actual costs of an organization. Costs can be captured as per department wise, area wise, responsibility person wise, etc. Assigning the costs to cost centers determines where the costs are incurred within the organization
  • SAP Cost center collects overhead expenditure from Finance/Asset Accounting/Manufacturing/Sales & Distribution/ Human Resources
  • Cost center helps to compare actual expenditure against plan expenditure
  • A cost center represents where cost occurs like location, department, responsibility center
  • Each cost can be linked to a work center from where cost comes to cost center
  • Activities like machine activity, cleaning activity etc. are performed in cost center

 

Overhead

  • Overhead cost refers to cost that cannot be directly assigned to production of goods and services of a company. Overhead cost can be Direct or Indirect overhead cost
  • Direct OH: This is allocated to the product based on activity
  • Indirect OH: Non activity related overhead cost. This is allocated to product in costing sheet. For e.g. 20% of material cost

 

SAP Cost Center include below topic

  1. Cost Center standard hierarchy in SAP
  2. Cost Center category
  3. Master data
    1. Cost Center
    1. Statistical Key Figures (SKF)
    1. Activity Type
  4. Planning
  5. Price Calculation
  6. Allocation Methods
  7. Cost Center budget
  8. Actual Posting
  9. Reports

 

SAP Cost Center  Hierarchy

Cost center hierarchy consists of groups of cost centers in a tree structure within a controlling area. Cost centers can be grouped together to provide summary cost information. Cost center hierarchy consists of nodes and sub-nodes that cost centers are attached to. Cost center hierarchy comprises all cost centers for a given period and therefore, represents the entire enterprise. This hierarchy is known as the standard hierarchy.

Cost center at the top of the Hierarchy is defined in transaction code OKKP

Other cost centers and Cost center group can be defined in transaction code #OKEON

Define Standard cost center hierarchy: OKEON

SAP cost center hierarchy

 

Cost Center Category in SAP

The Cost Center category is an indicator in the cost center master data, which specifies the category for the cost center. Examples include administration, production, sales & distribution cost center category. Cost Center categories provide the ability to safeguard your postings to cost centers as they will prevent non-category costs being posted to the wrong cost center. Cost Center category is also used for reporting purpose

IMG Path: SPRO- CONTROLIING – Cost Center Accounting- Master data -Cost Center -Define Cost center category

SAP Cost Center category
  • Quantity: If selected, quantity can be entered in the cost center
  • Actual Revenue: Indicator define whether a cost center is locked for posting with revenues. If selected, actual revenue cannot be posted to cost center. If not selected the revenues are written to the cost center as statistics only.
  • Plan Revenue: Indicator controlling whether a cost center is locked for planning with revenues. If selected, plan revenue cannot be posted to cost center. If not selected the revenues are written to the cost center as statistics only.

 

Create Cost Center Group

  • A Cost center group is a group of cost center. Used for reporting purpose
  • Cost center standard hierarchy highest node (highest cost center group) is created in transaction code #OKKP
  • Cost Center Groups created in Transaction code OKEON
  • Cost center group can also be created in transaction codes# KSH1/KSH2/KSH3

Transaction Code : OKEON

sap cost center hierarchy
sap cost center hierarchy

Transaction Code: KSH1/KSH2

sap cost center group

 

Create Cost Centers in SAP

Transaction Code: OKEON or KS01

Transaction to change / display Cost Center: KS02 / KS03

create sap cost center

For detailed, step-by-step instructions on SAP Cost Center Accounting, Product Costing, Profit Center Accounting, Internal Orders, FI-MM Integration follow along with my video tutorial below

SAP Cost center Training

Controlling

SKF (Statistical Key Figure)

The ‘Statistical Key Figure (SKF)’ is used as the basis (tracing factor) for making allocations (assessments/distributions). They are the statistical data such as number of employees, area in square meters, etc.

Suppose that you are incurring a monthly expense of USD 5,000 in the cost center cafeteria, the cost of which needs to be allocated to other cost centers. You can achieve this by the SKF. Imagine that you want this to be allocated based on the ‘number of employees’ working in each of the other cost centers such as administrative office (100 employees) and the factory (300 employees). You will now use the number of employees as the SKF for allocating the costs.

In SKF allocation, you have the flexibility of using two different SKF Categories; namely, Total value or Fixed value. You will use fixed values in situations where the SKF does not change very often, as in the case of the number of employees etc. You will use Total values in situations where the value is expected to change every now and then, as in the case of power use or water consumption in the cost center

Transaction code to create SKF: KK01 / KK02

SKF Description Category Unit
EMP No of employees FIX EA
SYSTEM No of Computer units FIX EA
POWER Power charge per month TOTAL KW
AREA Area per cost center FIX FT2

 

SKF Categories

  • Fixed: This does not change every month. E.g. no. of employees, SQFT area
  • Total: This is variable and changes every month. E.g. power bill

 

SKF Group

This is group of SKF. It is used for reporting purpose

Create SKF group: KBH1 / KBH2

create statistical key figure

 

Activity Type

  • Activity type classifies the activities that are performed within a company by one or several cost centers. E.g. of these activities are labor activity, machine activity, cleaning activity etc.

  • Activity type is the basis for allocating cost center overhead cost to Product costing
  • Activity type are assigned to work centers. Maximum of 6 activity types can be assigned to a work center. A Work center is an organization unit where manufacturing activities are performed. Thus, Work Centers are the master data which represent real machines, Production Lines, etc.

 

Activity Type categories

The activity type category lets you determine whether, and how, an activity type is allocated

  • Direct Activity Type Category
    • Manual entry, manual allocation: activity recorded manually. Activity allocated manually
    • Manual entry, No allocation: Idle time
  • Indirect Activity Type Category
    • Indirect determination, Indirect allocation
    • Indirect determination, manual entry  

 

Create Activity Type

  • Transaction code: KL01 / KL02 /KL03
  • For each activity type Secondary cost element of category 43 is required
  • Create secondary Cost Element: KA06
Sec Cost Element Name CE Category
943001 Labor activity cost 43: Internal activity allocation
943002 Machine activity cost 43: Internal activity allocation
943000 Set Up activity cost 43: Internal activity allocation
create activity type
Description Activity Type Activity Type Activity Type
Activity Type 330101 330102 330103
Description Set Up activity cost Machine activity cost Labor activity cost
Activity Unit HR: Hours HR: Hours HR: Hours
Cost center category * * *
Activity type category 1: Manual entry, manual allocation 1: Manual entry, manual allocation 1: Manual entry, manual allocation
Allocation Cost Element 943000: Set Up activity cost 943002: Machine activity cost 943001: Labor activity cost
Price Indicator-Plan 1: Plan price, automatically based on activity 1: Plan price, automatically based on activity 1: Plan price, automatically based on activity
Actl Activity Type category 1: Manual entry, manual allocation 1: Manual entry, manual allocation 1: Manual entry, manual allocation
Act Price Indicator 5: Actual price, automatically based on activity 5: Actual price, automatically based on activity 5: Actual price, automatically based on activity

 

Activity Type Group

Activity type group is a group of activities types. SAP activity types with similar activities can be grouped into activity type groups for internal reporting purposes. SAP activity type groups are used for assessment and planning.

Transaction code: KLH1 / KLH2 /KLH3

create activity type group

 

SAP Cost Center reports

Post a rent invoice: FB50

post FI document

 

Display Controlling Document: KSB5

sap display controlling document

Display Expense Posted to Cost Center

Transaction code :  KSB1

 

Display Cost Center Report: S_ALR_87013611

Display Cost Center Report: S_ALR_87013611

 

SAP Cost Center 

  • SAP Cost centers are responsibility areas for costs within organization and used to capture actual costs of an organization. Costs can be captured as per department wise, area wise, responsibility person wise, etc. Assigning the costs to cost centers determines where the costs are incurred within the organization
  • SAP Cost center collects overhead expenditure from Finance/Asset Accounting/Manufacturing/Sales & Distribution/ Human Resources
  • Cost center helps to compare actual expenditure against plan expenditure
  • A cost center represent where cost occurs like location, department, responsibility center
  • Each cost can be linked to a work center from where cost comes to cost center
  • Activities like machine activity, cleaning activity etc. are performed in cost center

Overhead

  • Overhead cost refers to cost that cannot be directly assigned to production of goods and services of a company. Overhead cost can be Direct or Indirect overhead cost
  • Direct OH: This is allocated to the product based on activity
  • Indirect OH
    • Non activity related overhead cost is allocated to product in costing sheet. For e.g. 20% of material cost

SAP Cost Center  topics

  1. Cost Center standard hierarchy in sap
  2. Cost Center category
  3. Master data
    1. Cost Center
    1. SKF
    1. Activity Type
  4. Planning
  5. Price Calculation
  6. Allocation Methods
  7. Cost Center budget
  8. Actual Posting
  9. Reports

Cost Center Standard hierarchy in sap

Cost center hierarchy consists of groups of cost centers in a tree structure within a controlling area. Cost centers can be grouped together to provide summary cost information. A cost center hierarchy consists of nodes and sub-nodes that cost centers are attached to. A cost center hierarchy comprises all cost centers for a given period and therefore, represents the entire enterprise. This hierarchy is known as the standard hierarchy.

Cost at the top of the Hierarchy is defined in transaction code OKKP

Other cost centers and Cost center group can be defined in transaction code #OKEON

Define standard hierarchy: OKEON

Cost Center Category in sap

The Cost Center category is an indicator in the cost center master data, which specifies the category for the cost center. Examples include administration, production, or sales & distribution cost center category. Cost Center categories provide the ability to safe guard your postings to cost centers as they will prevent non-category costs being posted to the wrong cost center. Cost Center category is also used for reporting purpose

IMG Path: SPRO- CONTROLIING – Cost Center Accounting- Master data -Define Cost center category

Cost Center Category
  • Quantity: If selected, quantity can be entered in the cost center
  • Actual Revenue: If selected, actual revenue cannot be posted to cost center. If not selected the revenues are written to the cost center as statistics only.
  • Plan Revenue: If selected, plan revenue cannot be posted to cost center. If not selected the revenues are written to the cost center as statistics only.

Create Cost Center Group

  • Cost center group is a group of cost center. Used for reporting purpose
  • Cost center standard hierarchy highest node is created in transaction code #OKKP
  • Create Cost Center Groups in Transaction code OKEON
  • Cost center group can also be created in transaction codes# KSH1/KSH2/KSH3
Cost Center Hierarchy : OKEON
Cost Center Hierarchy: OKEON

Create Cost Centers in sap

Transaction: OKEON or KS01

Transaction to change / display Cost Center: KS02 / KS03

Cost Centers

 

SKF (Statistical Key Figure)

The ‘Statistical Key Figure (SKF)’ is used as the basis (tracing factor) for making allocations (assessments/distributions). They are the statistical data such as number of employees, area in square meters, etc.

Suppose that you are incurring a monthly expense of USD 5,000 in the cost center cafeteria, the cost of which needs to be allocated to other cost centers. You can achieve this by the SKF. Imagine that you want this to be allocated based on the ‘number of employees’ working in each of the other cost centers such as administrative office (100 employees) and the factory (300 employees). You will now use the number of employees as the SKF for allocating the costs.

In SKF allocation, you have the flexibility of using two different SKF Categories; namely, Total value or Fixed value. You will use fixed values in situations where the SKF does not change very often, as in the case of the number of employees etc. You will use Total values in situations where the value is expected to change every now and then, as in the case of power use or water consumption in the cost center

Transaction code to create SKF: KK01 / KK02

SKF Description Category Unit
EMP No of employees FIX EA
SYSTEM No of Computer units FIX EA
POWER Power charge per month TOTAL KW
AREA Area per cost center FIX FT2

SKF Categories

  • Fixed: This does not change every month. E.g. no. of employees, SQFT area
  • Total: This is variable and changes every month. E.g. power bill

SKF Group

Group of SKF. Used for reporting purpose

Create SKF group: KBH1 / KBH2

Statistical Key Figure group

 

Activity Type

  • Various activities are performed in cost center. E.g. of these activities are labor activity, machine activity, cleaning activity etc.
  • Activity type measure these activities
  • Activity type is the basis for allocating cost center overhead cost to Product costing
  • Activity type are assigned to work centers. Maximum of 6 activity types can be assigned to a work center
  • A Work Center can be a place or a machine where production operations/activities are performed. Work Center is used in routing operations and production orders

 

Activity Type categories

  • Direct
    • Manual entry, manual allocation: activity recorded manually. Activity allocated manually
    • Manual entry, No allocation: Idle time
  • Indirect
    • Indirect determination, Indirect allocation:
    • Indirect determination, manual entry: 

Price Indicator

  • Manual
  • System calculated
    • It could be based on capacity
    • Price can also be calculated based on activity units

 

Create Activity Type

  • Transaction code: KL01 / KL02 /KL03
  • For each activity type secondary cost element of category 43 is required
  • Create secondary CE: KA06
Sec CE Name CE Category
943001 Labor activity cost 43: Internal activity allocation
943002 Machine activity cost 43: Internal activity allocation
943000 Set Up activity cost 43: Internal activity allocation
Create Activity Type
Description Activity Type Activity Type Activity Type
Activity Type 330101 330102 330103
Description Set Up activity cost Machine activity cost Labor activity cost
Activity Unit HR: Hours HR: Hours HR: Hours
Cost center category * * *
Activity type category 1: Manual entry, manual allocation 1: Manual entry, manual allocation 1: Manual entry, manual allocation
Allocation Cost Element 943000: Set Up activity cost 943002: Machine activity cost 943001: Labor activity cost
Price Indicator-Plan 1: Plan price, automatically based on activity 1: Plan price, automatically based on activity 1: Plan price, automatically based on activity
Act Activity Type category 1: Manual entry, manual allocation 1: Manual entry, manual allocation 1: Manual entry, manual allocation
Act Price Indicator 5: Actual price, automatically based on activity 5: Actual price, automatically based on activity 5: Actual price, automatically based on activity

Activity Type Group

Used for reporting

Transaction code: KLH1 / KLH2 /KLH3

Create Activity Type Group

 

SAP Cost Center reports

Post a rent invoice: FB50

Post finance invoice in SAP

Display CO Document: KSB5

Display controlling document

Display Cost Center Report: S_ALR_87013611

Display Cost Center Report in SAP

 

SAP Cost Center Planning

Cost center planning involves entering plan figures for costs, activity types, or statistical key figures for a particular cost center and a particular planning period. You can then determine the variances from these figures when you come to compare these plan values with the costs actually incurred.

Planning overview in SAP

Set controlling Area

Transaction OKKS

 

Input Planning

Activity independent Cost Element Planning for Cost Center

These are cost which are incurred independent of the activity performed in the cost center. These costs are generally incurred in Cost center where no manufacturing activities are performed. For E.g. Administration Department (CCTR#3301002), Canteen Department (CCTR#3301001). E.g. of such cost are Rent (CE#400300), Salaries (CE#400100), Telephone Rental (CCTR#400305).

Transaction: KP06

Planner Profile: 1-101 (Activity Independent, CE planning for the Cost Center)

Cost Center

Admin department 3301002
Canteen Department 3301001

 

Cost Element

400100 Salaries
400300 Rent
400304 Telephone rental
400305 Travel expenses
400306 Office supplies

Select Form based

 

Cost Center Report

Transaction code: S_ALR_87013611

SAP Cost Center report

Reporting Options:

Activity Dependent Planning

Cost Element values are planned for cost centers based on activity in the cost centers. So first we need to plan Activity hours per cost center. Then Plan CE / Expenses for each Activity type in the cost center

KP26 is used to plan Activity type values for cost center

KP06 is used to plan CE / Expenses for each Activity type in the cost center

Planned Activity Type / Cost Center

Transaction code: KP26

Layout: 1-201

Cost Center 3301004

Activity Type: 330101 to 330103

Activity type planning in SAP

Plan CE / Expenses for each Activity type in the cost center

Tcode: KP06

Same Cost Center # 3301004

Layout: 1-101

Enter planned fixed cost for combination of planned Activity type and Cost element

Cost for Activity dependent Cost Element

Activity dependent cost center planning
Activity dependent cost center planning

Cost Center Report

Transaction code: S_ALR_87013611

SKF Planning

SKF Planning for Cost Center

Transaction Code: KP46

Planner Profile: SAPALL

Cost Center wise SKF Planning

Planning Layout: 1-301 (Statistical key figures: standard)

Statistical Key figure planning

Report: S_ALR_87013611

 

Plan Cost Splitting

Transaction code: KSS4

If no specific splitting rule is defined system split plan fixed cost (CE400200) 100,000 equally among all activities in the cost center 3301004

Here the Cost Center cost is split equally between it’s three activities. In KSPI this cost is divided by planned activity hours for that activity. This planned cost per hours for the activity

Plan Cost splitting : KSS4

Execute Plan Price Calculation

Transaction code: KSPI

Plan price calculation : KSPI

Activity 330101 (Setup activity)

CE 400200 cost for period 4: 33,333

CE 400000 cost for period 4: 150000

Total 183,333n / 1200 = 152.7 => for 10 units 1527.7

Report to Check Activity Price per hour

Transaction code: KSBT

Check Activity Price

 

Define Splitting Rule

This is an optional step. It is used to split Activity independent cost (Defined in KP06 earlier) to various activities in the cost center.

Define Splitting Rule

Transaction code: OKES

Define Splitting rule : OKES
Define Splitting rule : OKES

 

Create Splitting Structure

Transaction code: OKES

Create splitting structure

 

Assignment

Transaction code: OKES

Create splitting structure

 

Selection for Assignment

Select assignment 1. Click selection for assignment and below entries

Similarly, for assignment 2

Selection for assignment 3. No need of Activity as CE is not split

Activity independent Cost Elements not assigned in Transaction OKES will be split equally

Assign Cost Center to splitting structure

Transaction code: OKEW

Select the cost center (3301004) – Now place cursor on splitting structure to which it has to be assigned – Right click – click assign

Assign cost center to splitting structure

Steps in Cost Center Plan Price calculation

  • Plan Activity hours for the cost center: KP26
  • Plan Cost Element cost independent of activity for the cost center: KP06
  • Plan CE cost dependent on activity for the cost center: KP06
  • Define splitting structure for activity independent cost: OKES
  • Assign splitting structure to Cost Center: OKEW
  • Plan Cost splitting for the cost center: KSS4
  • Execute Plan Price calculation: KSPI
  • Verify Activity Price per hour: KSBT

Plan Activity Hours per Cost Center: KP26

Plan CE activity dependent cost per Cost Center (Activity dependent): KP06

Plan CE activity Independent cost per Cost Center (Activity Independent): KP06

Plan Cost splitting for the cost center: KSS4

Execute Plan Price calculation: KSPI

Verify Activity Price per hour: KSBT

 

SAP Online Video Courses

 

Create Own Layout using SAP Report Painter

Create Planning Layout in sap

SAP Transaction code : KP65

SAP Report Painter

Click Create – Click Lead Column-Select Cost Center- Click Lead column – Select Characteristic Value and Name

SAP Report Painter, create planning layout

Second Lead column – Click New Lead column- Select Cost Element

SAP Report painter , create Layout
SAP Report painter , create Layout

Total Plan Cost Column:  Values are not entered in Lead column. Click the row with Column 1 to create column for entering total plan values

Distribution Key Column

Double click on empty dots- Select attribute – Select Distribution key – Key figure (PWOG) – Update

General Data Selection Column

Edit – Gen Data Selection – Gen data selection – Select version, period, fiscal year

Fix the Decimal place

Place the cursor on Total Plan cost – Click number format

 

Create Planner Profile in sap

Create Planner profile and assign layout created earlier to it

Transaction: KP34

Select and click General controlling- In Planning area select Cost element and activity input – In currency and Quantity select 1 (Equal distribution)

Select Planning area and click Layout for controlling – Select layout created in earlier step

 

Create Layout for Activity Output planning in sap

Transaction Code: KP75

Click lead column – Select cost center – select both Group and Individual – click lead column – Select both characteristic and Name

Second Lead column – New lead – Select activity type – remaining steps same as cost center above

Plan Activity Value

Click on Column 1 – Key figure (PLST)

Distribution Key column

Double click on dots next to column 1- Select attribute – Distribution key – Key for distribution as PLST

Unit Column

Double click on dots after distribution key – Attribute – Select Unit

Total Plan Price column

Double click on dots after units – Select key figure with characteristic – Key figure is PTOG (Plan Total Price in object currency)

General Data selection

Edit – Gen Data Selection – Gen data selection – Select Version, Period, Fiscal year– Save

Create Planner Profile

Tcode: KP34

Assign Activity Type planning layout to Planner profile

Use the Planner profile MK11 created earlier and assign layout ACTYPLANMK11 to it

Create Activity Type planned values for cost center

Tcode: KP26

Settings – Set Planner Profile- MK11

Explanation

  • Lead Column: These could be Cost Center / Activity Type / Cost Element.
  • Column 1 / Column 2 / Column 3 : These are values for lead column. Like Plan activity value, Plan activity Units (HR), Plan activity Distribution type (1- Equal, 2- Monthly etc.), Plan total Price
  • General Data Selection: Here you specify the header values- Version, Period, Fiscal Year

For detailed, step-by-step instructions on SAP Cost Center Accounting, follow along with my video tutorial below

Controlling

Please refer to SAP Cost Center Allocation tutorial for details on SAP Cost Center Reporting, Distribution and Assessment

 

 

4 thoughts on “SAP Cost Center Accounting”

  1. Pingback: sap controlling overview

  2. Pingback: SAP Controlling Tutorials | AUMTECH Solutions-SAP Training

  3. Pingback: SAP Tutorials | AUMTECH Solutions-SAP Training

  4. Pingback: SAP Controlling Questions & Answers | AUMTECH Solutions-SAP Training

Leave a Comment

Your email address will not be published. Required fields are marked *

error: Content is protected !!